Installation Guide for Drainage and Ground Reinforcement Grids
Our Drainage and Ground Reinforcement Grids are quick and easy to install requiring minimum labour and skill. But there are several varieties of grid and paving available. Here is A Guide to the Installation of the version shown. The lightweight interlocking profile design enables ease and speed of installation. Optimal laying time is 100m2 per person per hour onto a prepared base. NOTE: Maximum advised gradient for traffic applications without pegging: 5% | ||